Energy Efficient HVAC System for an IT park, Bangalore
-
The project involves air-conditioning of Software and Hardware Park, Pritech 2 SEZ having an air-conditioned floor area of 12,48,620 sq.ft having three blocks namely blocks 5, 6 & 7. To cater to the air-conditioning needs a combination of water cooled centrifugal, air cooled screw and vapour absorption chillers are contemplated.
-
3 Nos Water cooled centrifugal chillers each having a capacity of 700 TR, 10 Nos air-cooled screw chillers each having a capacity of 350 TR and 1 no vapour absorption chiller using waste heat from Diesel Generating Set/Diesel/Compressed Natural gas totaling to a capacity of 6300 TR are envisaged. All chillers excepting the vapour absorption chillers are installed.
-
The hybrid chiller combination with water cooled centrifugal chiller will use recycled water from Sewage Treatment plant and will run when the ambient is hot, the air-cooled screw chillers again with a combination of High and Normal Efficiency (5 nos of each type) will run during the periods of low/medium ambient temperatures while the vapour absorption chiller is mainly designed to run during the periods when DG sets are functional recovering the waste heat.
-
The chillers are located in the Utility block having the Lower level with DG sets, Middle level with pump sets and water cooled centrifugal and absorption chillers, intermediate level for chilled water and condenser water piping system and the upper level with air- cooled chillers and cooling towers.
|